RCR® is compliant with the PN EN 12467:2016-8 5.4.5-6 standard, which means there are no visible drops of water. If 100% waterproofing is required, ITL can custom fabricate a liner. We would be happy to discuss your project.
RCR® as an Initial Liner or
Rehabilitative Solution
Inland Tarp & Liner (ITL) offers RCR® (Reinforced Concrete Roll®), a geosynthetic cementitious composite mat (GCCM) that forms a durable culvert lining, whether as an initial liner or to rehabilitate a worn-down or damaged culvert.
RCR® is an advanced concrete composite that installs easily and provides lasting strength, offering municipalities and transportation departments a viable, cost-effective solution for culvert lining.
RCR® for Culvert Lining and Rehabilitation
A tough concrete composite liner, RCR® is meant to stay in place and provide years of reliable use.
We offer a 30-year, pro-rated RCR® warranty.
Cost-Effective
Culvert Lining
Talk to our team about financial savings. RCR® is more cost-effective
to install than traditional concrete pours.
Efficient and Flexible Installation
RCR® installation does not involve forms or rebar, and the product can be installed in dry conditions, in rain, or underwater. Also, RCR® can be cut to specified dimensions and positioned to fit around contours.
Talk to our team about installation efficiency and flexibility for saving time and money on your culvert lining project.
Effective Culvert
Rehabilitation
For information on how RCR® can be applied to culvert rehabilitation projects, contact project manager Leo Cortez.
Culvert Pipe Repair Case Study
RCR-7® for a Culvert Pipe Project in Ohio
Overview
RCR-7® was installed to repair a 60-inch culvert pipe running 24 feet long, made of 8-gauge corrugated galvanized steel.
Project Goal
Repair a 30-year-old culvert pipe thinned by water and sediment flow while also minimizing disruption to traffic from an adjacent highway.
Why RCR® for the Job
Given a shorter section with two curves, using traditional concrete would have been more costly and time-intensive than deploying RCR®, which would have delayed the canal's return to use. Also, compared to RCR®, other geomembrane options would have been more susceptible to vandalism and animal damage.
Aspects of the Installation
One roll of RCR-7®, which is a 7mm composite concrete product, was pre-cut to 4-foot x 6-foot sheets and Hilti-fastened every 6 inches along the inside top edges and the end of the pipe. Sheets down the length of the pipe were overlapped by 6 inches and welded together with a handheld propane torch.
The installation was benefitted by the ability of RCR® to mold well to the pipe corrugations during the hydration process.
Tar sealed the top edges before the RCR-7® product was hydrated.
Completion
The pipe was returned to service immediately after installation.
“We pride ourselves on being solution providers and ITL RCR® was a great solution for the application and ease of installation. It took a half a day to line the 60” pipe. Our customer has indicated they will continue the use of ITL RCR® for future culvert linings.”
— Jerry Frantz,
Technical Sales Manager,

Additional Culvert Repair Case Studies
RCR® was used in an inverted culvert repair project in Wyoming and for culvert remediation in Texas. Get information on these installations:
Inverted Culvert Repair
Culvert Remediation
Video: Culvert Repair
Watch this video to get an inside view of a culvert repaired with RCR®
Culvert Lining Q&A
Can RCR® be installed in wet conditions?
Yes. RCR® can be installed in wet conditions, including underwater.
Can ITL RCR® be cut and fitted around penetrations?
Yes. RCR® can be sealed around virtually all penetrations.
How are multiple pieces of RCR® connected?
Pieces of RCR® can be connected by overlapping approximately 150mm (6 inches) of the product and then hot torching the overlapping pieces together.
RCR® pieces can also be butted side by side with no overlap if small gaps are acceptable for an application.
The standard size of an RCR® roll is 5m wide x 20m long (approximately 16 ft., 4 in. x 65 ft., 7 in.). With additional lead time, custom sizes are available. Standard-sized RCR-7® rolls are 1,700 lbs., and standard-sized RCR-12® rolls are 2,800 lbs.
Culvert Lining Solutions for Cities
and Transportation Departments
We offer cities and transportation departments GCCM culvert lining solutions. Please contact us to learn more about RCR®.